Posted in knitting

Friday’s Finished Object

Glammed up water bottle carrier

Keeping with my self-imposed deadline, I managed to finish off another UFO. This is the be-ribboned and beaded water bottle carrier that I started over five years ago.

The part that had stumped me was how to finish out the top edge and strap. I found a solution by Melanie Smith on Ravelry. She simply divided the stitches in half, working each half in stockinette, gradually decreasing until five stitches remained. Then she worked I-cord about 15 inches each side and grafted the sides together.

https://www.ravelry.com/patterns/library/4th-of-july-water-bottle-holder

Thanks, Melanie.

I tried to make the strap long enough to sling it over a shoulder. Here I show it knotted so it can be carried over the wrist. The yarn is a bamboo blend purchased from the hobby store. Hopefully it will prove strong enough. I worked the middle section side-ways, knitting a metallic ribbon in. The top section is beaded.

This is a standard 16 oz. bottle. The piece is actually big enough to hold a taller bottle.

Two down, eleven to go. Hooray!

Unknown's avatar

Author:

One of six children, I was raised by a busy mom, who instilled in me a love of fabric. Though I learned to sew and knit at a young age, it was the arrival of my first grandchild that pushed me into action. A long-time knitter, I am now ready to explore all things fiber.

2 thoughts on “Friday’s Finished Object

Leave a comment